Tuesday, 5 February 2008
Minutes
Present: Tarek, Maysoon, Mohannad, Khaled, Abdelmohsin.
Absent: None.
Meeting:
Location: Starbucks
- Time: 1pm
- Length: 1hr 15mins
The group discussed the advantages and disadvantages of using either the waterfall or cyclone design method. We agreed to base our project on the waterfall design method but more specifically using the modified waterfall method called Sashimi. Tarek volunteered to do the project timeline on project manager.
0 comments
0 Comments:
Absent: None.
Meeting:
